Skip to main content

Table 4 Measurements at all lumbar vertebral levels (n = 96)

From: Cortical screw placement with a spinous process clamp guide: a cadaver study accessing accuracy

Parameter

Groups

Total (n = 96)

L1 (n = 8)

L2 (n = 8)

L3 (n = 8)

L4 (n = 8)

L5 (n = 8)

S1 (n = 8)

LA (°)

Planning screws (n = 48)

9.2 ± 1.8

9.0 ± 0.8

9.9 ± 0.8

10.3 ± 0.8

11.2 ± 0.7

8.4 ± 0.8

6.2 ± 0.5

Inserted screws (n = 48)

9.1 ± 1.7

8.6 ± 1.0

9.4 ± 0.8

10.1 ± 0.5

11.3 ± 0.8

8.6 ± 0.8

6.4 ± 0.5

p value

0.662

0.744

0.709

0.085

0.830

0.901

0.735

t/Z/ × 2

0.377

0.982

1.237

0.663

− 0.128

− 0.445

− 0.635

CA (°)

Planning screws (n = 48)

22.8 ± 5.6

27.7 ± 1.2

27.8 ± 3.5

24.1 ± 2.0

22.3 ± 3.7

20.5 ± 2.0

14.4 ± 4.6

Inserted screws (n = 48)

23.0 ± 5.1

30.0 ± 1.0

27.3 ± 3.0

24.3 ± 2.0

21.2 ± 2.1

20.9 ± 2.5

15.3 ± 3.1

p value

0.760

0.388

0.393

0.766

0.155

0.734

0.146

t/Z/ × 2

− 0.213

− 2.765

0.328

− 0.203

0.708

− 0.347

− 0.478

DBST (mm)

Planning screws (n = 48)

38.5 ± 3.9

34.7 ± 2.9

35.4 ± 2.5

37.3 ± 1.6

38.2 ± 1.1

40.8 ± 0.9

44.8 ± 1.3

Inserted screws (n = 48)

39.6 ± 4.3

35.5 ± 2.2

35.8 ± 1.7

37.5 ± 1.4

39.3 ± 2.2

43.7 ± 1.0

46.1 ± 1.3

p value

0.272

0.713

0.435

0.625

0.166

0.887

0.872

t/Z/ × 2

− 0.929

− 0.438

− 0.325

− 0.211

− 0.836

− 4.330

− 1.382

  1. LA lateral angle, CA cranial angle, DBST distance of screw tip. p < 0.05 compared with the preoperative value