R2 | R2nE | T2 | T2nE | R2E vs (T2E-R2E) | ||
---|---|---|---|---|---|---|
Number | 114 | 478 | 268 | 324 | 315 | |
5 years | % | 98.6 | 97 | 97.7 | 97 | 96.2 |
Standard error | 0.014 | 0.009 | 0.012 | 0.011 | 0.013 | |
Exposed to the risk | 31 | 235 | 114 | 152 | 143 | |
7 years | % | 98.6 | 96.6 | 97.7 | 96.3 | 96.2 |
Standard error | 0.014 | 0.010 | 0.012 | 0.012 | 0.013 | |
Exposed to the risk | 9 | 129 | 59 | 79 | 79 | |
Log Rank | 0.314 | 0.319 | 0.322 |